PM CTRL reference
Fehmarn Sound crossing – combined road/rail immersed tunnel
Immersed tunnel, approx. 2.2 km, four lanes and two tracks
New crossing of the Fehmarn Sound as part of the hinterland connection of the Fehmarn Belt Fixed Link. DB InfraGO and DEGES deliver the project jointly as an alliance; the alliance contracts were signed in November 2025.
- Client (owner)
- DB InfraGO AG and DEGES (alliance)
- Contract with
- Arup Deutschland GmbH (PM CTRL as subcontractor)
- Role
- Schedule control within the engineering consortium · 07/2026 – present
- Volume
- Contract packages approx. €1.8 bn (cost estimate DB InfraGO/DEGES, Q1/2024)
The photo shows the existing Fehmarn Sound Bridge at the project site; the tunnel has not yet been built.