The 16th Construction Phase of the A100 motorway represents the largest and most technically complex transport infrastructure project in Berlin. The inner-city project comprises an approximately 3.2 km long, six-lane motorway section, executed almost entirely as a cut-and-cover trough structure, forming a continuous and highly complex engineering structure within a dense urban environment.
The project includes a wide range of demanding tunnel, bridge and civil engineering structures, all delivered under live urban traffic conditions:
Tunnel Structure
Bridge Structures
Civil Engineering Structures & Infrastructure
Technical Systems
Project Management and Project Control for the largest infrastructure project in Berlin, with a strong focus on schedule controlling, structured construction sequence management and reliable project reporting. Responsible for comprehensive interface management across tunnel, bridge, civil and technical disciplines, as well as stakeholder management involving public authorities, rail operators, utility companies and emergency services, ensuring transparent decision-making and coordinated project delivery within a highly complex urban environment.