Your Project. Under Control

Complex infrastructure projects. Clearly controlled.

Project management and project controls for complex transport and infrastructure projects.

PM CTRL provides project management, project and cost control, schedule control and risk management for clients, engineering firms and contractors. From design to commissioning, in line with the German AHO and HOAI frameworks.

years of experience in construction
13+
Project volume of Berlin projects supported by the founder since 2022
€1.3bn
project management across the AHO project stages
AHO
Project Management Professional (PMI)
PMP®

01Services

What PM CTRL does for your project

02Schedule review tool

CTRL SCAN

How robust is your schedule? CTRL SCAN checks it against 14 quality criteria based on the DCMA 14-Point Assessment.

Schematic illustration, no project data

03Projects

Selected projects

Urban motorway, bridges over live railway, tunnels, stations: PM CTRL and its founder have worked in project management on schemes owned by Die Autobahn GmbH, DEGES, the State of Berlin and Deutsche Bahn. At Deutsche Bahn as an employee of the client, on the other projects as a subconsultant to engineering firms.

  • A100 16th section alongside the S-Bahn line in Berlin, aerial view

    Founder's reference

    A100, 16th section

    Urban motorway, Berlin

    Client (owner)
    Die Autobahn GmbH des Bundes
    Contract with
    Krebs+Kiefer Ingenieure GmbH (founder, freelance)
    Role
    Project management (AHO), project stages 3 and 4
    Volume
    approx. €764m
  • PM CTRL reference

    Ringbahn and Westend bridges, A100

    Motorway bridges over live railway, Berlin

    Client (owner)
    DEGES
    Contract with
    Zetcon Ingenieure GmbH (PM CTRL as subconsultant)
    Role
    Schedule control, risk management and reporting
    Volume
    approx. €130m
  • Filstal bridge on the Wendlingen–Ulm high-speed line

    Photo: iStock.com/Uwe Moser

    Founder's reference

    Stuttgart 21, Albaufstieg

    Wendlingen–Ulm high-speed line, tunnels and bridges

    Client (owner)
    DB Projekt Stuttgart–Ulm GmbH
    Contract with
    Employed by the client (founder)
    Role
    Schedule and cost management
    Volume
    over €1bn

Also: Tangential Connection East (TVO) · approx. €351m · technical project lead, contracted by Krebs+Kiefer

All references
“Particularly noteworthy are the very high level of professional expertise and the structured, solution-oriented approach.”
Reference letter, Krebs+Kiefer Ingenieure GmbH, A100 16th section, 03/2026 (translated)

Project owners on our projects

  • Deutsche Bahn
  • DEGES
  • Die Autobahn GmbH
  • State of Berlin

Contract partners

  • Krebs+Kiefer
  • Zetcon
  • Arup

How can we support you?

  • Clients

    Transparency on cost, schedule, risk and progress, prepared as a reliable basis for your decisions.

    Read more – Clients
  • Engineering firms

    Defined services in project controls, schedule control, risk management and reporting, delivered independently as a subconsultant.

    Read more – Engineering firms
  • Contractors and joint ventures

    Support with construction sequence control, cost and schedule analyses and the investigation of disrupted construction sequences.

    Read more – Contractors and joint ventures

Projects between Germany and Poland

For German-Polish projects PM CTRL offers the same services: project management, project controls and risk management, schedule control and delay analysis. In addition, PM CTRL provides technical project coordination between German and Polish project parties, in German, Polish and English.

  • Coordination between clients, designers and contractors from both countries
  • Bridging German and Polish working methods and project standards
  • Bilingual schedules, reports and minutes
Sergius Winter, Managing Director of PM CTRL

04About

Founder-led.
Personally accountable.

  • B.Eng. Civil Engineering
  • MBA
  • PMP®

PM CTRL is led by Sergius Winter, civil engineer (B.Eng.), MBA and PMP®. His experience comes from major transport infrastructure projects:

  • Wendlingen–Ulm high-speed line as part of Stuttgart 21, Albaufstieg with the Boßler and Steinbühl tunnels (over €1bn)
  • A100 urban motorway, 16th section in Berlin (approx. €764m), controlled through to opening

On projects owned by Deutsche Bahn, DEGES, Die Autobahn GmbH and the State of Berlin. At PM CTRL you work with him directly.

Does your project need control?

Briefly describe the project, its phase and what you need. We will get back to you on your enquiry.