EÜ RIN 01, a part of the Megaproject: A100 – 16th Construction Phase – Berlin

Photo: Thomas Rosenthal

Founder's reference

EÜ RIN 01, a part of the Megaproject: A100 – 16th Construction Phase – Berlin

Project management under AHO

Owner
Die Autobahn GmbH des Bundes
Contract partner
KREBS+KIEFER Ingenieure GmbH (founder, freelance)
Role
Project management under AHO
Structure
Railway Bridge, S-Bahn
Phase
Execution
Period
02/2022⁠–⁠12/2025
Construction volume
approx. 30€ million

Project Description

The EÜ RIN 01 is a skewed integral reinforced concrete structure within a complex infrastructure environment. The abutments and piers are founded on diaphragm walls (1.40 m thickness, 26 m length), with sections of the abutment walls executed as T-shaped panels. The structure comprises two spans of 35.12 m and 39.26 m, resulting in a total span length of 74.38 m along the bridge axis. The bridge width varies between 11.15 m and 14.70 m and crosses the A100 at a skew angle of 32.11 gon (approx. 28.9°).