Grenzallee Tunnel (A100 – 16th Construction Phase) – Berlin

Photo: Thomas Rosenthal

Founder's reference

Grenzallee Tunnel (A100 – 16th Construction Phase) – Berlin

Project management under AHO, project stages 3–4

Owner
Die Autobahn GmbH des Bundes
Contract partner
KREBS+KIEFER Ingenieure GmbH (founder, freelance)
Role
Project management under AHO, project stages 3⁠–⁠4
Structure
Motorway Tunnel
Phase
Execution
Period
02/2022⁠–⁠12/2025

Description

The Grenzallee Tunnel is an inner-city road tunnel constructed as part of the A100 motorway extension in Berlin. The structure was delivered using the cut-and-cover method under highly constrained urban conditions and while maintaining live traffic, resulting in a high level of interface and coordination complexity.

Key Facts

  • Structure type: Road tunnel (cut-and-cover construction)
  • Total length: 386 m
  • Cross-section: Six-lane configuration
  • Traffic layout: Three lanes per direction
  • Project environment: Dense urban area with ongoing traffic and a high number of stakeholders