CTRL DELAY
Comparison of schedule updates from MS Project and Primavera P6
CTRL DELAY shows what has changed between two or more updates of a schedule: dates, milestones, logic links, durations and float. The analysis describes changes. It makes no statement about causes, responsibilities or claims.
CTRL DELAY
- MS Project XML and Primavera P6 XER
- Two or more schedule updates
- Runs locally in the browser, no data transfer
Who CTRL DELAY is for
Clients
Trace updates of the contractor's schedule before an update is accepted or used as the basis for a report.
Read more – ClientsEngineering firms
Document changes between schedule updates in project controls and construction supervision and present them in reports.
Read more – Engineering firmsContractors and joint ventures
Check your own updates for unintended changes to milestones, logic links and durations before submission.
Read more – Contractors and joint ventures
What CTRL DELAY analyses
Comparison of schedule updatesChanges per activity: dates, durations, logic links and float.
Milestone trend analysis, near and far viewMilestone trend analysis across all updates, with contractual deadlines.
Potentially driving predecessor chain (heuristic)Indication of predecessor chains that may affect a milestone.
Shortened durationsNotably shortened durations.
Float notesNotes on the development of total float.
Describes what has changed between updates. No statement about causes, responsibilities or claims.
What data is needed
- At least two updates of the same schedule
- MS Project as XML export or Primavera P6 as XER export
- Consistent activity identifiers across all updates (UID or Activity ID)
- Optional: contractual deadlines for manual entry
Limits of the analysis
- No schedule calculation: dates, float and durations are taken as they appear in the file.
- Review notes are rule-based and do not replace a professional review of the schedule.
- Development status: version 0.5 (prototype).
Runs locally in the browser, no data transfer
CTRL DELAY is a single HTML file and runs in the browser without installation. Schedules are analysed on your own computer and are not uploaded. The file loads no external content.
How to enquire
Tell us briefly which software you plan with and which analyses you need. We will get back to you with a proposed date.
- Request a demoBy e-mail or via the contact form.
- DemonstrationOnline, with fictitious example data from MS Project and Primavera P6.
- Discuss your useWhich schedules, which updates and which analyses you need.
Enquiry about CTRL DELAY
Briefly describe the project, its phase and what you need. We will get back to you on your enquiry.
Reach us directly: info@pmctrl.com+49 176 64 700 208