Boßlertunnel (Stuttgart–Ulm / Stuttgart 21) – Baden-Württemberg
Schedule and cost management
- Owner
- DB Projekt Stuttgart–Ulm GmbH
- Employer
- DB Projekt Stuttgart–Ulm GmbH (founder, employed)
- Role
- Schedule and cost management
- Structure
- Railway Tunnel
- Phase
- Execution
- Period
- 04/2016–03/2020
- Construction volume
- approx. 550€ million
Description
The Boßlertunnel is one of the key engineering structures of the Wendlingen–Ulm high-speed rail line and an integral part of the Stuttgart–Ulm rail project. The tunnel enables the efficient crossing of the Swabian Alb and forms a critical backbone for high-speed rail traffic in southern Germany.
Project Overview
- Structure type: Twin-bore railway tunnel
- Total length: approx. 8.8 km
- Construction method Mechanised tunnelling using Tunnel Boring Machines (TBM)
- Use: Long-distance and high-speed rail traffic
- Design speed: up to 250 km/h
- Project characteristics Large-scale infrastructure project with demanding geological conditions, high schedule and cost pressure, and complex interfaces between tunnelling, fit-out works and railway systems

Related references

Photo: iStock.com/Uwe Moser
Founder's reference
Filstal Bridge, part of the Wendlingen–Ulm high-speed rail line (Stuttgart 21 programme)
- Role
- Schedule and cost management
- Owner
- DB Projekt Stuttgart–Ulm GmbH
- Employer
- DB Projekt Stuttgart–Ulm GmbH (founder, employed)
- Period
- 04/2016–03/2020
- Construction volume
- approx. 200€ million
Founder's reference
Steinbühltunnel (Stuttgart–Ulm / Stuttgart 21) – Baden-Württemberg
- Role
- Schedule and cost management
- Owner
- DB Projekt Stuttgart–Ulm GmbH
- Employer
- DB Projekt Stuttgart–Ulm GmbH (founder, employed)
- Period
- 04/2016–03/2020
- Construction volume
- approx. €255 million