Methods and experience from project controls in infrastructure construction: schedule review, construction sequence analysis, reporting. Without client project data, with examples marked as such.

Articles

24 November 2026 · 9 min read

DCMA schedule review: what the 14 criteria reveal about a construction schedule

How owners and project controls teams check the technical quality of a schedule: the 14 criteria of the DCMA 14-Point Assessment, their thresholds, typical findings in infrastructure projects and the limits of the method.

Terminplanprüfung · DCMA 14-Point Assessment · Termincontrolling · MS Project · Primavera P6