Westendbrücke, A100 – Berlin

Schedule control, risk management and reporting

Owner
DEGES
Contract partner
Zetcon Ingenieure GmbH
Role
Schedule control, risk management and reporting
Structure
Motorway Bridge
Phase
Planning & Execution
Period
since 09/2025, construction until 2027
Construction volume
approx. 50€ million

Project Description

The Westend Bridge is a key structure on the A100 motorway (northbound) between the interchanges Kaiserdamm and Spandauer Damm. The original prestressed concrete bridge, built in 1963, was subjected for years to traffic volumes significantly beyond the assumptions made at the time of construction, leading to substantial structural deterioration. As refurbishment was not feasible due to the structural system, a replacement scheme was developed and the existing bridge was demolished in April 2025.

Following the closure of the affected A100 section since March 2025, the replacement bridge can now be constructed independently of live traffic in the same alignment, without requiring adjacent properties—enabling a notable reduction in construction duration. Delivery is planned largely in parallel with the Ringbahn Bridge replacement, aiming to restore traffic functionality on the currently closed motorway section as quickly as possible. Current execution is impacted by, among other factors, unexpected granite layers in the ground and demolition works on remaining elements (e.g., abutment structures), requiring enhanced coordination of programme, logistics and impact management.